Materials take-offs and tender packs from the drawings
Quantities measured for you and every material priced and linked, so you can quote, tender and order faster.
From £95, fixed by floor area. Complete drawings today, ready by 2 working days. Work out your price
We are not quantity surveyors. You check the figures before you use them, and you stand behind them.
Materials take-off prices by floor area
The total you pay for one set of drawings. Complexity and express add a set percentage; see all prices and work out yours.
| Floor area of the work | Materials take-off |
|---|---|
| Up to 25 m² | £95 |
| 25 to 50 m² | £125 |
| 50 to 100 m² | £195 |
| 100 to 150 m² | £265 |
| 150 to 250 m² | £385 |
| 250 to 400 m² | £525 |
| Over 400 m² | quoted |
Tendering? The tender pack
Quantities by trade, materials priced from three merchants, and sheets for your own labour, preliminaries and overheads, plus a programme template and one addendum re-measure. You add labour, margin and risk and submit the tender as your own; the employer may not rely on our figures.
| Floor area of the work | Tender pack |
|---|---|
| Up to 25 m² | £195 |
| 25 to 50 m² | £295 |
| 50 to 100 m² | £445 |
| 100 to 150 m² | £595 |
| 150 to 250 m² | £845 |
| 250 to 400 m² | £1,195 |
| Over 400 m² | quoted |
How builders use it
A materials take-off gives you quantities and priced materials to quote from, without measuring the drawings yourself. Every line links to the merchant's product page, so you can swap in your own account prices.
The workbook is yours to edit. Add your labour and margin and you have the basis of a quote. Check the quantities against the drawings and site before you order or quote: the figures are yours once you use them.
What to send
- The drawings you are pricing from, as PDF
- Any specification or schedule the architect gave you
- Which merchant you use, if you want mid prices from them
Four steps, fixed price
You send drawings
Send the PDFs. We confirm the fixed price and date, and you pay by card through Stripe.
We measure
Areas and lengths come from the drawing's own lines. We check the scale on every sheet and flag errors.
We price
Each material is priced from a Bradfords, Selco or Wickes product page, with the link in the workbook.
You check it
You get an Excel workbook with low, mid and high totals, built so you can check every line.
Questions from builders
Can I use my own trade prices?
Does it include my labour?
Are you quantity surveyors?
Who is responsible for the figures?
Get a materials take-off from £95
Attach your drawings and we reply within one working day with the fixed price.