We are not quantity surveyors. Our cost plans are estimates. You check every figure before you rely on it, and you are responsible for how you use it.Estimates you check and stand behind. How this works
Measured & PricedCornwall
For builders

Materials take-offs and tender packs from the drawings

Quantities measured for you and every material priced and linked, so you can quote, tender and order faster.

From £95, fixed by floor area. Complete drawings today, ready by 2 working days. Work out your price

We are not quantity surveyors. You check the figures before you use them, and you stand behind them.

Prices

Materials take-off prices by floor area

The total you pay for one set of drawings. Complexity and express add a set percentage; see all prices and work out yours.

Floor area of the workMaterials take-off
Up to 25 m²£95
25 to 50 m²£125
50 to 100 m²£195
100 to 150 m²£265
150 to 250 m²£385
250 to 400 m²£525
Over 400 m²quoted

Tendering? The tender pack

Quantities by trade, materials priced from three merchants, and sheets for your own labour, preliminaries and overheads, plus a programme template and one addendum re-measure. You add labour, margin and risk and submit the tender as your own; the employer may not rely on our figures.

Floor area of the workTender pack
Up to 25 m²£195
25 to 50 m²£295
50 to 100 m²£445
100 to 150 m²£595
150 to 250 m²£845
250 to 400 m²£1,195
Over 400 m²quoted

Send tender drawings

How builders use it

A materials take-off gives you quantities and priced materials to quote from, without measuring the drawings yourself. Every line links to the merchant's product page, so you can swap in your own account prices.

The workbook is yours to edit. Add your labour and margin and you have the basis of a quote. Check the quantities against the drawings and site before you order or quote: the figures are yours once you use them.

What to send

  • The drawings you are pricing from, as PDF
  • Any specification or schedule the architect gave you
  • Which merchant you use, if you want mid prices from them
How it works

Four steps, fixed price

01

You send drawings

Send the PDFs. We confirm the fixed price and date, and you pay by card through Stripe.

02

We measure

Areas and lengths come from the drawing's own lines. We check the scale on every sheet and flag errors.

03

We price

Each material is priced from a Bradfords, Selco or Wickes product page, with the link in the workbook.

04

You check it

You get an Excel workbook with low, mid and high totals, built so you can check every line.

Questions

Questions from builders

Can I use my own trade prices?
Yes. Every line links to the product and the workbook is editable, so you can replace any price with your account price.
Does it include my labour?
No. Add your own labour and margin, or for £45 we build labour from your rates.
Are you quantity surveyors?
No. We are not chartered and not regulated by RICS. We produce estimates for budgeting and design decisions. If a lender, insurer, funder, tender or contract will rely on the figures, use a chartered quantity surveyor.
Who is responsible for the figures?
You are, once you use them. You must check every quantity and price before you rely on or share them. Our liability is limited to the fee you paid. The full position is in our terms of business.

Get a materials take-off from £95

Attach your drawings and we reply within one working day with the fixed price.

Send your drawings